2288 Broadway 3rd Floor Old Trash Shoot Removal

2288 Broadway 3rd Floor Old Trash Shoot Removal

Our customer, Moroso Construction of San Francisco, requested Nichols to remove an existing concrete 46″ wide x 38″ deep x 9′ high Abandoned concrete trash shoot on the 3rd-floor tenant improvement. Nichols had to saw cut 15″ deep on both sided...
2006 Washington St – 10th floor

2006 Washington St – 10th floor

Our customer, Moroso Construction of San Francisco, requested Nichols to figure out how to saw cut, break, and remove the exterior wall to enlarge existing window openings without dropping debris down 10 stories’. Our team determined the safest way to saw cut...
Ping Yuen – Chinatown Housing

Ping Yuen – Chinatown Housing

Our customer, Cahill Construction of San Francisco, requested Nichols perform saw cut and safe removal of the existing concrete railing walls to create new temporary pass through openings for the construction man lift elevator on their project. Nichols was required to...
Office 2nd story TI

Office 2nd story TI

Our customer, TWY Construction of San Mateo, requested Nichols to estimate and perform the saw cutting and safe remove of 2nd floor concrete wall to create new window openings. Nichols was required to work off hours, saw cut and core drill the openings from the inside...